<form id="aailz"></form>
    1. <nav id="aailz"></nav>
      1. <nav id="aailz"></nav>
      2. Yunnan Baiyao Group Phase I Project Logistics System Project

                The equipment and system of the center are as follows:

                1) 12 sets of railroad road stacking machines;

                2) A set of box picking and conveying systems;

                3) A set of vacuum systems;

                4) A set of software control systems;

                5) A set of pallet picking and conveying systems.

        一级黄色录像影片 - 视频 - 在线观看 - 电影影院 - 品赏网